TONNES: 335
CLIENT: Toyota New Zealand
MAIN CONTRACTOR: Colspec Construction
LOCATION: Palmerston North
JOB TYPE: Structural Engineering / Seismic Strengthening
When Toyota started the process of adding 11,000 square metres to their existing 24,000m2 warehouse in Kelvin Grove, they called us to help with structural engineering and seismic strengthening. We worked with Colspec Construction on the 10,764m2 covered floor area with canopies of 464m2 and 900m2, erecting 295 tonnes of structural steel.
MORE
Engineering for Te Puna Hapori, Whanganui's new courthouse. Delivered alongside iwi, Naylor Love, Jasmax and WSP.
Our team put in months of hard work to fabricate, weld and assemble approximately 45 tons of drive gear, chains and gearboxes for the new log infeed system at Qube Holdings Napier’s de-barker. The transport process which required five truckloads went smoothly and with precision and determination, the installation was smooth and efficient. This project included custom-fabricated components.