TONNES: 428
CLIENT: Willis Bond
MAIN CONTRACTOR: LT McGuiness
ARCHITECT: Athfield Architects
LOCATION: Wellington, NZ
JOB TYPE: Structural Engineering
Wedged between key civil infrastructure and a busy arterial road, Site 9’s Wellington waterfront position had challenging height restrictions which required a unique and complex design.
Low-rise and base-isolated for superior seismic resilience, Site 9 features a unique out-of-ground seismic plane located underside of Level 1. The site’s height restrictions meant that a three-storey building was the most likely option but with careful co-ordination, the project team delivered a four-storey building.
There was just 50mm between the ceiling and structure beams, so every pipe, cable and duct penetration had to be carefully planned to ensure services’ runs were achieved and costly alterations to steelwork were avoided.
MORE
Engineering for Te Puna Hapori, Whanganui's new courthouse. Delivered alongside iwi, Naylor Love, Jasmax and WSP.
Our team put in months of hard work to fabricate, weld and assemble approximately 45 tons of drive gear, chains and gearboxes for the new log infeed system at Qube Holdings Napier’s de-barker. The transport process which required five truckloads went smoothly and with precision and determination, the installation was smooth and efficient. This project included custom-fabricated components.