TONNES: 317
MAIN CONTRACTOR: Hawkins Construction
LOCATION: Palmerston North
JOB TYPE: Seismic Strengthening
Along with Hawkins, we were involved in this seismic strengthening project for the Plaza carpark in Palmerston North. Over 1,200 catch brackets were installed, along with some heavy Steltech ‘K’-Frames, to bring this structure up to code.
MORE
Featured
Engineering for Te Puna Hapori, Whanganui's new courthouse. Delivered alongside iwi, Naylor Love, Jasmax and WSP.
Our team put in months of hard work to fabricate, weld and assemble approximately 45 tons of drive gear, chains and gearboxes for the new log infeed system at Qube Holdings Napier’s de-barker. The transport process which required five truckloads went smoothly and with precision and determination, the installation was smooth and efficient. This project included custom-fabricated components.